SITEMAP UPDATES ABOUT
:: CONTACT
MiC Quality

ASQ CSSBB Six Sigma Black Belt Certification

  PROCESS IMPROVEMENT AND SIX SIGMA
ONLINE COURSES FREE TRIAL SIX SIGMA FAQ BROCHURES LICENSES ENROLL
SIX SIGMA
:: Online Courses
:: Free Trial
:: Six Sigma
>> Glossary
>> Calculators
>> Reference Tables
>> Book Reviews
>> Black Belt ASQ
:: FAQ
:: Brochures
:: Licenses
:: Discounts
Welcome to MiC Quality Online Learning

MiC Quality
:: Home :: SIX SIGMA :: ASQ SSBB :: CURRENT STUDENTS LOGIN
 
Six Sigma Black Belt ASQ SSBB Body of Knowledge
The ASQ SSBB exam contains questions from many topics. These are listed in the Body of Knowledge reproduced below. This version of BOK includes links to our Six Sigma Glossary.
I. ENTERPRISE WIDE DEPLOYMENT
II. ORGANIZATIONAL PROCESS MANAGEMENT AND MEASURES
III. TEAM MANAGEMENT
IV. DEFINE
V. MEASURE
VI. ANALYZE
VII. IMPROVE
VIII. CONTROL
IX. DESIGN FOR SIX SIGMA FRAMEWORKS AND METHODOLOGIES
   
[SIX SIGMA GLOSSARY INDEX OF TOPICS]
VIII. CONTROL (21 questions)
  1. Objectives
    Define and describe the objectives of SPC, including monitoring and controlling process performance, tracking trends, runs, etc., and reducing variation in a process. (Understand)
  2. Selection of variables
    Identify and select critical characteristics for control chart monitoring. (Apply)
  3. Rational subgrouping
    Define and apply the principles of rational subgrouping. (Apply)
  4. Control chart selection
    Select and use the following control charts in various situations:
    x-bar and R, x-bar and s, individual and moving range (ImR), p, np, c, u, short-run SPC and moving average. (Apply)
  5. control chart analysis
    Interpret control charts and distinguish between common and special causes using rules for determining statistical control. (Analysis)

B. Other control tools

  1. Total productive maintenance (TPM)
    Define the elements of TPM and describe how it can be used to control the improved process. (Understand)
  2. Visual factory
    Describe the elements of a visual factory and describe how they can help control the improved process. (Understand)

C. Maintain Controls

  1. Measurement system re-analysis
    Review and evaluate measurement system capability as process capability improves, and ensure that measurement capability is sufficient for its intended use. (Evaluate)
  2. Control plan
    Develop a control plan for ensuring the ongoing success of the improved process including the transfer of responsibility from the project team to the process owner (Apply)

D. Sustain improvements

  1. Lessons learned
    Document the lessons learned from all phases of a project and identify how improvements can be replicated and applied to other processes in the organization. (Apply)
  2. Training plan deployment
    Develop and implement training plans to ensure continued support of the improved process. (Apply)
  3. Documentation
    Develop or modify documents including standard operating procedures (SOP's) work instructions, etc. to ensure that the improvements are sustained over time. (Apply)
  4. Ongoing evaluation
    Identify and apply tools for ongoing evaluation of the improved process, including monitoring for new constraints, additional opportunities for improvement, etc. (Apply)
IMPROVE Previous Next DESIGN FOR SIX SIGMA

FREE Trial
TRY FREE eLearning Module "Introduction to Statistics"
PDF DOWNLOAD FREE Booklet for Primer in Statistics course

OUR COURSES
Statistical Process Control (SPC)
Advanced Statistical Process Control (SPC)
Supporting process improvement, quality control, quality assurance, quality management, six sigma training and ASQ certification (CQE, SSBB, SSGB)
Copyright 1998-2008 MiC Quality Legal Notices and Privacy Policy